House Renovation: How to Improve Your Home in Six Steps

Home Remodeling cost
  • Author: Fazal Umer
  • Posted On: November 7, 2023
  • Updated On: November 7, 2023

Home improvement is a thrilling and mind-blowing time since you are about to make your dream come true. At the same time, when you start to think about the details, you begin to understand that the whole process is rather a challenging business plan. Therefore, you have to plan every detail of it, and this article will help you with that.

Guided Tour for House Renovation

Step One: Build a Comprehensive Plan

Making a detailed plan is a cornerstone of the whole project of renovation. In the beginning, you need to draft what should be done. Such a plan must include the ultimate goal for your house improvement and overall design for contractors. In addition, make a list of what you may do yourself and what is left for professional workers.

In general, the list of initial preparations includes:

  • The research of all permits. Find out what is allowed to remodel and what is not;
  • The volume of your budget;
  • The current state of your property;
  • The final goal of the whole project.

Step Two: Determine a Budget for the Renovation

This step figures out how much money you are ready to allocate for the renovation. The budget must include the expenses for permits, building stuff, and the payment for a hired contractor. There are tools that help calculate certain parts of renovations. For example, if your plan includes the renovation of your roof and you decide to cover it with thermoplastic polyolefin, the TPO roofing cost calculator will allow you to do it quickly.

Step Three: Recruit Contractors

It is equally important to choose the relevant team for renovation. While choosing among contractors, you will need to pay attention to the following points:

  • Years of experience;
  • Appropriate license;
  • Proof of insurance;
  • Recommendations and references;
  • Payment plan.

Step Four: Set the Order for Every Project

We strongly recommend moving from large-scale renovations toward small ones. Make sure your contractor knows it and agrees with you. In the beginning, start improving such utilities as hot and cold running water pipes and electric circuit wiring. Modern houses consume more electricity, and improved electric installation will prevent fuse blowing.

Once you are done with the major renovations, proceed with smaller ones. When you finish all main upgrades, tackle to improvement of the room where you spend much time. After that, get down to the installation of the new lighting system and the rest smaller things. In the end, after all fixtures, you may decorate your home with an interior design that you choose in advance.

Step Five: Schedule a Timeline for the Project

When you are ready with a budget and contractor, it is time to set a timeline. Decide on what day you want to start. Consult with your team about the time for all stages of work. Figure out the precise sequence of all steps and what works can be performed simultaneously. Make sure your timeline includes the following:

  • Time for preparation of the whole area;
  • Time for the delivery of every necessary equipment and building stuff;
  • Your contractor’s days off.

Step Six: Be Ready with Plan B When Renovating

Always expect the unexpected. The most elaborate plans cannot take into consideration everything. Do not let it make you disappointed. Just get ready for this having a part of your budget assigned for that. In addition, make sure that your timeline takes into account such possible issues. These measures will help you to diminish stress and reduce the whole process of improvement. Don’t forget that those who are warned are armed.

We hope that these hints will be useful for your house renovation. Good luck!

Avatar photo
Author: Fazal Umer

Fazal is a dedicated industry expert in the field of civil engineering. As an Editor at ConstructionHow, he leverages his experience as a civil engineer to enrich the readers looking to learn a thing or two in detail in the respective field. Over the years he has provided written verdicts to publications and exhibited a deep-seated value in providing informative pieces on infrastructure, construction, and design.