Objective: The main objective of this survey job is to set out a horizontal simple circular curve on the ground utilizing two theodolite methods in th...
Read more Setting out simple circular curve- two theodolite method- Farhan Khan
- April 25, 2021
Objective: The main objective of this survey job is to set out a horizontal simple circular curve on the ground utilizing two theodolite methods in th...
Read more Setting out simple circular curve- two theodolite methodObjective: The main objective of this job is to set out a simple circular horizontally using Rankine’s method. Apparatus: Theodolite Ranging pole Ra...
Read more Setting Out Simple Circular Curve – Rankine’s MethodObjective: The main aim of this job is to mark the center line of foundation from the given building drawing using the centerline method. Apparatus: T...
Read more To mark the centre line of foundation for the given building drawing.Objective: The objective of this job is to determine the gradient of the line between two given stations and determine the reduce level of station B w...
Read more To determine the gradient of the line joining the given staff stations A and B and to find the Reduced Level of station B.Objective: The primary objective of this survey job is to determine the elevation of an inaccessible tower. Apparatus: Theodolite Tripod stand Ranging...
Read more To determine the elevation of an inaccessible object (Tower)Objective: The main objective of this job is to calculate the horizontal angles in the field using the method of reiteration. Apparatus: Electronic th...
Read more Measurement of the horizontal angle by using reiteration methodApparatus: Electronic theodolite Tripod stand Ranging rod Least count of the instrument: Least count of electronic theodolite = 00°00’05’’ Rela...
Read more Measurement of horizontal angle – repetition methodObjective: The primary objective of this job is to determine the configuration of ground level by surveying and drawing longitudinal and cross-section...
Read more L-Section and cross section of the road (one full size drawing sheet each for L- section and cross section)Aim Fixing bench mark with respect to temporary bench mark with dumpy level by fly leveling and check leveling. Apparatus: Dumpy level, leveling staff...
Read more Fixing bench mark with respect to temporary bench mark with dumpy level by fly leveling and check leveling.Aim: To plot the contours of an area by method of squares (or gridding). Equipment and Accessories: Automatic Level, tripod, Levelling staff, chain, t...
Read more To plot the contours of an area by method of squares (or gridding).