Objective: The main objective of this job is to set out a simple circular horizontally using Rankine’s method. Apparatus: Theodolite Ranging pole Ra...
Read more Setting Out Simple Circular Curve – Rankine’s Method- Attic
- Basement
- Bathroom
- Bedroom
- Cabinets
- Carpentry
- Ceiling
- Cleaning
- Closets
- Concreting
- Countertops
- Decking
- Dining Room
- Doors
- Drainage System
- Driveway
- Fence
- Fireplace
- Flooring
- Furniture
- Garage
- Gardening
- Grill
- Home Decor
- HVAC
- Inspections
- Insulations
- Kitchen
- Laundry Rooms
- Lawn
- Lighting
- Living Room
- Masonry
- Painting
- Pathways & Sidewalks
- Patio
- Pest control
- Plumbing
- Porch
- Roofing
- Sheds
- Siding
- Smart Homes
- Solar panels
- Stairs
- Tiling
- Walls
- Windows
- Yards
- Farhan Khan
- April 25, 2021
Objective: The main aim of this job is to mark the center line of foundation from the given building drawing using the centerline method. Apparatus: T...
Read more To mark the centre line of foundation for the given building drawing.- Farhan Khan
- April 25, 2021
Objective: The objective of this job is to determine the gradient of the line between two given stations and determine the reduce level of station B w...
Read more To determine the gradient of the line joining the given staff stations A and B and to find the Reduced Level of station B.- Farhan Khan
- April 25, 2021
Objective: The primary objective of this survey job is to determine the elevation of an inaccessible tower. Apparatus: Theodolite Tripod stand Ranging...
Read more To determine the elevation of an inaccessible object (Tower)- Farhan Khan
- April 25, 2021
Objective: The main objective of this job is to calculate the horizontal angles in the field using the method of reiteration. Apparatus: Electronic th...
Read more Measurement of the horizontal angle by using reiteration method- Farhan Khan
- April 25, 2021
Apparatus: Electronic theodolite Tripod stand Ranging rod Least count of the instrument: Least count of electronic theodolite = 00°00’05’’ Rela...
Read more Measurement of horizontal angle – repetition method- Farhan Khan
- April 25, 2021
Objective: The primary objective of this job is to determine the configuration of ground level by surveying and drawing longitudinal and cross-section...
Read more L-Section and cross section of the road (one full size drawing sheet each for L- section and cross section)- Farhan Khan
- April 25, 2021
Aim Fixing bench mark with respect to temporary bench mark with dumpy level by fly leveling and check leveling. Apparatus: Dumpy level, leveling staff...
Read more Fixing bench mark with respect to temporary bench mark with dumpy level by fly leveling and check leveling.- Farhan Khan
- April 24, 2021
Aim: To plot the contours of an area by method of squares (or gridding). Equipment and Accessories: Automatic Level, tripod, Levelling staff, chain, t...
Read more To plot the contours of an area by method of squares (or gridding).- Farhan Khan
- April 24, 2021
Survey Using Minor Instruments In this article, we will discuss the minor instruments that can be used for surveying. Let’s start with a discussion ...
Read more Minor Instruments – Clinometer, Ceylon Ghat Tracer, Hand Level, Box Sextant, Planimeter And Pantagraph