Investigation of rainfall – run off for long duration of rain

Investigation of rainfall – run off for long duration of rain
  • Author: Farhan Khan
  • Posted On: July 6, 2020
  • Updated On: July 6, 2020

Objective

To investigate the rainfall-runoff relation of a long duration rain storm on dry catchment.

Apparatus:

  1. Basic Hydrology Apparatus
  2. Stopwatch

Constants:

  1. Rainfall intensity=20L/min.
  2. Time interval=30sec.

Graph

Plot a hydrograph between time (x-axis) and discharge (y-axis).

Procedure

  1. Set the slope of hydrology apparatus as zero.
  2. Make sure that the catchment is dry.
  3. Turn off all the outlet valves (all four) except the one at the point of concentration (outlet valve).
  4. Now set the flow at 20L/m.
  5. Turn on the rain valve and allow the rain over the catchment area for as long as the discharge at the outlet (in L/s) gets constant.
  6. Note the discharge in L/s for every 30s intervals.
  7. Note the time for max discharge that shall be the time of concentration Tc.

Observation

 

S/No.

Time T

(sec)

Discharge Qt

(l/sec)

 

S/No.

Time T

(sec)

Discharge Qt

(l/sec)

1
2

Precautions

  1. There should be no losses at the outlet; to ensure that keep all the four discharge valves closed.
  2. Set the discharge at the assigned value not considering the back-pressure
  3. Note some additional readings too, so that falling limb can be plotted

 

Avatar photo
Author: Farhan Khan

Farhan is a highly experienced civil engineer from the Southern side of Texas and has been associated with ConstructionHow since 2020. Over almost a decade, his wide span of expertise enabled him to bring forth his fair share of stories and experiences related to the most iconic engineering examples worldwide. He has also contributed to online and offline publications on requests. Engineering is his passion, which is why he chose to become part of our honorable team of industry experts looking to provide authentic and credible guidelines to the reader.

YOU MIGHT ALSO LIKE

To determine the workability of concrete mix of given proportion by compaction factor test.

Compacting factor test is performed using guidelines from past researches. However, BS 1881-103 has detailed the guidelines for performing the compact...

Read more To determine the workability of concrete mix of given proportion by compaction factor test.
To determine the specific gravity, void ratio, porosity and bulk density of given coarse and fine...

Introduction: The aggregates have different properties based on the type such as fine and the coarse aggregate types. The concrete mixture comprises o...

Read more To determine the specific gravity, void ratio, porosity and bulk density of given coarse and fine aggregates.