Build, Renovate, Upgrade

Renovate or build your home with our handy guides and tips narrated by industry experts.

L-Section and cross section of the road (one full size drawing sheet each for L- section...

Objective: The primary objective of this job is to determine the configuration of ground level by surveying and drawing longitudinal and cross-section...

Read more L-Section and cross section of the road (one full size drawing sheet each for L- section and cross section)
Fixing bench mark with respect to temporary bench mark with dumpy level by fly leveling and...

Aim Fixing bench mark with respect to temporary bench mark with dumpy level by fly leveling and check leveling. Apparatus: Dumpy level, leveling staff...

Read more Fixing bench mark with respect to temporary bench mark with dumpy level by fly leveling and check leveling.
Minor Instruments – Clinometer, Ceylon Ghat Tracer, Hand Level, Box Sextant, Planimeter And Pantagraph

Survey Using Minor Instruments In this article, we will discuss the minor instruments that can be used for surveying. Let’s start with a discussion ...

Read more Minor Instruments – Clinometer, Ceylon Ghat Tracer, Hand Level, Box Sextant, Planimeter And Pantagraph
To determine difference in elevation between two points using fly leveling and Fly back leveling

Aim: To determine difference in elevation between two points using fly leveling and Fly back leveling. Booking the values using both HI and Rise and F...

Read more To determine difference in elevation between two points using fly leveling and Fly back leveling