Avatar photo

Farhan Khan 179 Posts Published

Farhan is a highly experienced civil engineer from the Southern side of Texas and has been associated with ConstructionHow since 2020. Over almost a decade, his wide span of expertise enabled him to bring forth his fair share of stories and experiences related to the most iconic engineering examples worldwide. He has also contributed to online and offline publications on requests. Engineering is his passion, which is why he chose to become part of our honorable team of industry experts looking to provide authentic and credible guidelines to the reader.

L-Section and cross section of the road (one full size drawing sheet each for L- section...

Objective: The primary objective of this job is to determine the configuration of ground level by surveying and drawing longitudinal and cross-section...

Read more L-Section and cross section of the road (one full size drawing sheet each for L- section and cross section)
Fixing bench mark with respect to temporary bench mark with dumpy level by fly leveling and...

Aim Fixing bench mark with respect to temporary bench mark with dumpy level by fly leveling and check leveling. Apparatus: Dumpy level, leveling staff...

Read more Fixing bench mark with respect to temporary bench mark with dumpy level by fly leveling and check leveling.
Minor Instruments – Clinometer, Ceylon Ghat Tracer, Hand Level, Box Sextant, Planimeter And Pantagraph

Survey Using Minor Instruments In this article, we will discuss the minor instruments that can be used for surveying. Let’s start with a discussion ...

Read more Minor Instruments – Clinometer, Ceylon Ghat Tracer, Hand Level, Box Sextant, Planimeter And Pantagraph
To determine difference in elevation between two points using fly leveling and Fly back leveling

Aim: To determine difference in elevation between two points using fly leveling and Fly back leveling. Booking the values using both HI and Rise and F...

Read more To determine difference in elevation between two points using fly leveling and Fly back leveling
To survey an area by chain survey across obstacles and to calculate the obstructed lengths.

Objective: The main objective of this survey job is to survey an area by chain survey across obstacles and calculate the obstructed lengths in that ar...

Read more To survey an area by chain survey across obstacles and to calculate the obstructed lengths.
« Previous 1 6 7 8 9 10 18 Next »